How NYC Sidewalk Violation Removal Works

From your first call to violation dismissed — here's exactly what happens, step by step.

Quick summary: Estimate → Permit → Pour → Dismissal. Most jobs are done within 1–2 weeks of your call. The 75-day clock is real — don't wait.
1

You Contact Us — We Already Have Your Violation

Call 516-423-2002 or fill out the online form. We pull up your address in our live DOT violation database (133,000+ violations). Most of the time, we already have your Preliminary Inspection Report (PIR) on file — including the flag count, violation codes, and location. This means a faster, more accurate estimate with no guessing.

2

Free On-Site Estimate

A member of our team comes to your property to physically measure the sidewalk flags that need replacement. We calculate the exact square footage, check the grade and slope requirements, and look for any complicating factors (tree roots, utility conflicts, slope issues). You receive a written estimate with a firm price — no "it depends" pricing. Most estimates are delivered within 24–48 hours of your call.

3

DOT Permit Filing

Once you approve the estimate, we file the NYC Department of Transportation street opening permit on your behalf. The permit application requires details about the scope of work, contractor license information, and insurance certificates. We handle all of this. DOT permit approval typically takes 2–5 business days. During this time, we schedule your crew and material delivery.

4

Saw-Cut, Remove, and Pour

Our crew arrives with a concrete saw, excavation equipment, and DOT-spec concrete mix. We saw-cut the existing flagging at the proper expansion joints, remove the damaged concrete, compact the sub-base, and pour new concrete to DOT specifications. Proper thickness (minimum 4 inches, 6 inches near curbs), correct slope for drainage, and finished surface texture are all DOT requirements we meet every time.

5

Cure and Inspect

Concrete requires proper curing time — typically 24–72 hours before foot traffic is restored, and 28 days to reach full strength. We protect the fresh concrete and return to ensure it cured correctly. NYC DOT may send an inspector to verify the work meets specifications before closing the permit.

6

Violation Dismissed — Lien Risk Eliminated

Once the work passes inspection, we submit the completion documentation to NYC DOT. The agency officially closes your violation. If a lien had been placed on your property, the release is filed automatically upon dismissal. Your property is clean. You're done.

How Long Does It Take?

📞

Day 1: You Call

We look up your violation, discuss the situation, and schedule an estimate visit.

📋

Days 2–3: Estimate

On-site measurement and written estimate delivered within 24–48 hours.

📄

Days 3–8: Permit

DOT permit filed and approved. Usually 2–5 business days.

🏗️

Days 8–12: Work

Crew arrives, concrete poured, properly cured.

Days 12–21: Dismissed

DOT inspects and closes your violation. Done.

Ready to Start? Call Now.

The sooner you call, the more time you have before the 75-day deadline. Free estimate, no obligation.